National Open University Library

Image from Google Jackets

The role of communication in large infrastructure : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.

By: Contributor(s): Material type: TextSeries: Washington DC World Bank 2006Edition: 1st edDescription: xi, 42 pages : illustrations, mapISBN:
  • 1280516356
  • 9786610516353
  • 0821366831
Subject(s): DDC classification:
  • 333.91/409664
Contents:
Contents; Abstract; Foreword; Acknowledgments; Acronyms and Abbreviations; 1 Introduction; LIST OF BOXES AND GRAPHS; 2 The Communication-based Assessment (CBA); 3 Communication for Operational Support; 4 Lessons Learned; 5 Conclusions; Bibliography
Summary: Infrastructure development in the past was often implemented without adequately taking into consideration the possible negative environmental and social impacts. Drawing from the experience of the Bumbuna Hydropower project in Sierra Leone, this paper proposes to complement safeguard policies by establishing, at the beginning of the project identification phase, two-way communication mechanisms and a continuous consultation process, allowing the government and the donors to interact with key stakeholders.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Books Owerri Study Centre HC1065.M39 2006 (Browse shelf(Opens below)) Available 0198295

Description based upon print version of record.

Contents; Abstract; Foreword; Acknowledgments; Acronyms and Abbreviations; 1 Introduction; LIST OF BOXES AND GRAPHS; 2 The Communication-based Assessment (CBA); 3 Communication for Operational Support; 4 Lessons Learned; 5 Conclusions; Bibliography

Infrastructure development in the past was often implemented without adequately taking into consideration the possible negative environmental and social impacts. Drawing from the experience of the Bumbuna Hydropower project in Sierra Leone, this paper proposes to complement safeguard policies by establishing, at the beginning of the project identification phase, two-way communication mechanisms and a continuous consultation process, allowing the government and the donors to interact with key stakeholders.

There are no comments on this title.

to post a comment.
Share