The role of communication in large infrastructure : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.
Material type:
TextSeries: Washington DC World Bank 2006Edition: 1st edDescription: xi, 42 pages : illustrations, mapISBN: - 1280516356
- 9786610516353
- 0821366831
- 333.91/409664
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Books
|
Owerri Study Centre | HC1065.M39 2006 (Browse shelf(Opens below)) | Available | 0198295 |
Browsing Owerri Study Centre shelves Close shelf browser (Hides shelf browser)
Description based upon print version of record.
Contents; Abstract; Foreword; Acknowledgments; Acronyms and Abbreviations; 1 Introduction; LIST OF BOXES AND GRAPHS; 2 The Communication-based Assessment (CBA); 3 Communication for Operational Support; 4 Lessons Learned; 5 Conclusions; Bibliography
Infrastructure development in the past was often implemented without adequately taking into consideration the possible negative environmental and social impacts. Drawing from the experience of the Bumbuna Hydropower project in Sierra Leone, this paper proposes to complement safeguard policies by establishing, at the beginning of the project identification phase, two-way communication mechanisms and a continuous consultation process, allowing the government and the donors to interact with key stakeholders.
There are no comments on this title.